Industrial Heavy Duty Rack Factory Price Steel Pallet Racking Storage Systems From Warehouse Pallet Rack Manufacturer
| Length (mm) | 1500 | 1800 | 2000 | 2300 | 2500 | 2700 | 3000 | 3300 |
| Beam Specification | Load / kg | |||||||
| 80×50 | 3000 | 2300 | 1800 | 1500 | 1200 | 1000 | 800 | 700 |
| 100×50 | 4000 | 4000 | 3000 | 2400 | 2000 | 1750 | 1400 | 1100 |
| 120×50 | 4000 | 4000 | 4000 | 3500 | 3000 | 2500 | 2000 | 1800 |
| 140×50 | 4000 | 4000 | 4000 | 4000 | 4000 | 3800 | 3000 | 2500 |
With widened and thickened design, the contact area between the welding pad and the ground is large, which enhances friction with the ground and ensures enhanced stability.
It adopts a new design, reasonably inserted into the kit on the beam. Convenient to disassemble and assemble, and the layer height can be adjusted at will.
After welding, the screws are reinforced, ensuring the connection between shelves is firmer. Goods will not fall off even under heavy weight.
Welding and rolling reinforced ribs can be welded under the beam to enhance its bearing capacity and make the beam resistant to deformation.
A: We are a direct manufactory specializing in high-quality storage racks.
A: Our factory is located in Nanjing City, Jiangsu Province, China. You can fly directly to Nanjing International Airport, where we will arrange to pick you up. All clients from home and abroad are warmly welcome to visit us!
A: We premium select Q235 grade steel as the primary raw material for optimum strength and durability.
A: Standard export packaging is utilized. All racking parts are bundled securely with steel belts and wrapped in protective plastic film.
A: We accept T/T payment and LC at sight. Our primary shipping loading ports are Nanjing or Shanghai port.
A: Delivery depends on order quantity and rack types, typically ranging between 15 to 30 days upon receipt of the deposit.